Search by module
Search by category
- Advance Work Packaging (AWP) Best Practice
- Building Information Modeling (BIM)
- Communication Management
- Construction Claims
- Contract Management
- Cost Management
- COVID-19 Pandemic
- Design Management
- Digital Transformation
- Earned Value Management
- Engineering
- Health, Safety and Environment (HSE) Management
- Lean Construction Management Best Practice
- Multilingual, Multi-currency
- Performance Reporting
- Project Management Body of Knowledge (PMBOK)
- Project Management Office (PMO)
- Property Management
- Public Private Partnership
- Quality Management
- Resource Management
- Risk Issue Management
- Sustainable Project Delivery
Tracking Actual Spent Resource Hours Construction Sites at the Project Activity Level While Complying with Project’s Formal Communication Requirements
PMWeb
One of the key challenges that face project planners is how to track and report the actually spent labor and...
Read More
Managing the Letter of Award for Design and Construction Contracts Process in Construction Projects
PMWeb
Letter of Acceptance also referred to as the “Letter of Award”, is legally considered as the Employer’s formal acceptance of...
Read More
How to Implement Proactive Snagging Approach to Identify Defects and Omissions on Construction Projects
PMWeb
In construction projects, a snag list (occasionally referred to as a punch list) defines the process of inspection necessary to...
Read More
Managing FIDIC 2017 Early Warning Provisions in Construction Projects
PMWeb
For the first time, the FIDIC 2017 Red Book introduces advance warning provisions (sub-clause 8.4), which requires each Party to...
Read More
Managing, Monitoring and Evaluating Safety Incidents in Construction Projects
PMWeb
In construction projects, all incidents, regardless of their perceived severity, must be reported to the Project Safety Management Team after...
Read More
How Can You Stop Wasting and Instead Create Value with the Massive Priceless Information Captured in Meeting Minutes During the Capital Project Life Cycle Phases?
PMWeb
You will never find a single capital project, regardless of its size, type, location, or duration that does not require...
Read More
Monitoring and Tracking Material and Equipment Alternative or Substitution Requests on Construction Projects
PMWeb
For construction projects that the specifications permit "or equal" alternatives or substitutions after contract award, the contractor is entitled to...
Read More
Setting the Project Control System (PCS) HSSE Management: HSSE Key Performance Indicators
PMWeb
On a construction project, regardless of whether the project control system (PCS) was managed by the project owner or contractor,...
Read More
Setting the Project Control System (PCS) Communication Management: Incoming and Outgoing Correspondence
PMWeb
No construction project can be executed without exchanging letters between the project stakeholders. Those letters are considered to be formal communication...
Read More
Setting the Project Control System (PCS) Communication Management Module: Meetings
PMWeb
Another communication management process that is common to construction projects and for which the project team needs to report is...
Read More
Setting the Project Control System (PCS) Communication Management Module: Request for Information (RFI)
PMWeb
The request for information (RFI) also known as requests for clarifications (RFC) and requests for interpretation (RFI) is the communication...
Read More
Setting the Project Control System Communication Management Module
PMWeb
Communication management is an integral component of any project control system (PCS) regardless of the construction project type or size...
Read More
Setting the Project Control System (PCS) Quality Management Module: Concrete Pouring Inspection Reports
PMWeb
Another quality control process that needs to be monitored, evaluated, and reported in the project control system (PCS) is the Concrete...
Read More
Setting the Project Control System (PCS) Quality Management Module: Technical Submittals
PMWeb
The Quality Management module is another critical project control system (PCS) module. The module addresses the quality assurance and quality...
Read More
Setting the Project Control System (PCS) Cost Management Module: Change Management
PMWeb
There is a very slim chance that a construction project is completed without encountering changes. There are many events that...
Read More
Assets Blog Building Information Models (BIM) Forms Project Management Office (PMO) Resource Management Schedules Tools
Setting the Project Control System (PCS) Schedule and Resource Management Module: Schedule Delays
PMWeb
Function 4: Schedule Delays On construction projects, schedule delay claims that affect the project completion date are becoming a common...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Resource Management
PMWeb
Function 3: Resource Management One of the requirements of all construction projects is for contractors to load their integrated project...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Updated Schedules
PMWeb
Function 2: Schedule Update Although the Activity Boards has the details of the actual progress achieved on the project, nevertheless...
Read More
The Project Control System (PCS) Applications
PMWeb
One of the key things that learned during four decades of being involved in the delivery of construction projects is...
Read More
Blog Building Information Models (BIM) Cost Management Forms Portfolio Project Management Office (PMO)
Project Control System (PCS) on Building Information Modeling (BIM) Enabled Projects
PMWeb
For projects where Building Information Modeling (BIM) is used by the contractor for developing the shop drawings (LOD 400) based...
Read More
Categories: Blog Categories