Search by module
Search by category
- Advance Work Packaging (AWP) Best Practice
- Building Information Modeling (BIM)
- Communication Management
- Construction Claims
- Contract Management
- Cost Management
- COVID-19 Pandemic
- Design Management
- Digital Transformation
- Earned Value Management
- Engineering
- Health, Safety and Environment (HSE) Management
- Lean Construction Management Best Practice
- Multilingual, Multi-currency
- Performance Reporting
- Project Management Body of Knowledge (PMBOK)
- Project Management Office (PMO)
- Property Management
- Public Private Partnership
- Quality Management
- Resource Management
- Risk Issue Management
- Sustainable Project Delivery
How to Have Complete and Comprehensive Shop Drawings, As-Built Drawings, Method Statements, Material Samples, and Other Submittal Logs for Construction Projects
PMWeb
One of the critical requirements of any construction project is to have a complete and comprehensive submittal log to ensure...
Read More
How to Implement Proactive Snagging Approach to Identify Defects and Omissions on Construction Projects
PMWeb
In construction projects, a snag list (occasionally referred to as a punch list) defines the process of inspection necessary to...
Read More
Monitoring and Tracking Contractor’s Thirty (30) Days Submittal Requirements
PMWeb
Almost every construction project has immediate submittal requirements that the Contractor needs to submit and secure the Project Owner’s approval...
Read More
Setting the Project Control System (PCS) Quality Management Module: Punch List
PMWeb
One of the quality controls processes that exists on any construction project for which a project control system (PCS) reports is the Punch List or Snag List. The traditional approach to using this...
Read More
Setting the Project Control System (PCS) Quality Management Module: Quality Performance Report
PMWeb
Regardless of whether the project owner has decided to digitalize the different quality control processes or not, there will be...
Read More
Setting the PCS Quality Management Module: Non-Compliance Reports
PMWeb
The Non-Compliance Report (NCR) is one of the quality controls processes that must be managed in any project control system...
Read More
Setting the Project Control System (PCS) Quality Management Module: Static and Rotating Equipment Inspection Checklists
PMWeb
Another quality control process that needs to be monitored, evaluated, and reported in the project control system (PCS) is the Static and RotatingEquipment Inspection Checklists. For oil and gas projects, static equipment comprises valves, boilers, furnaces, and...
Read More
Setting the Project Control System (PCS) Quality Management Module: Concrete Pouring Inspection Reports
PMWeb
Another quality control process that needs to be monitored, evaluated, and reported in the project control system (PCS) is the Concrete...
Read More
Setting the PCS Quality Management Module: Work Inspection Requests and Material Inspection Requests
PMWeb
The Work Inspection Request (WIR) is one of the quality controls processes that need to be monitored, evaluated, and reported in...
Read More
Digitizing the Quality Management Plan for Capital Construction Projects
PMWeb
The Project Quality Management Plan (PQMP) for capital construction projects is a written document that serves as the basis for...
Read More
Using BIM to Provide Visibility of Equipment and Material that Needs to be Submitted and Procured on Construction Projects
PMWeb
One of the critical requirements on any construction project is to have a complete and comprehensive submittal register to ensure...
Read More
Tracking and Monitoring Spare Parts Usage During the Capital Project Standard and Extended Warranty Periods
PMWeb
Once the project reaches the handover stage, the contractor needs to turn over the spare parts as per the contract...
Read More
Inspection Checklists for Static and Rotating Equipment on Construction Sites
PMWeb
It is common for construction projects that the contractor’s scope of work will include installing static and rotating equipment as...
Read More
Managing, Monitoring and Evaluating Request for Site Inspections for Construction Works
PMWeb
One of the reasons for change orders that are attributed to the site supervision consultant action is the inappropriate rejection...
Read More
Monitoring, Evaluating and Reporting on Concrete Pour in Construction Projects Using Checklists
PMWeb
No one can deny the high cost, delays and wasted effort of rework for poor quality of work. This is...
Read More
Categories: Blog Categories