How CDOT Replaced SiteManager and Unified Project Delivery with PMWEB

Written by PMWEB | Nov 24, 2026, 4:37:20 PM

The Colorado Department of Transportation (CDOT) plans, builds, and operates Colorado's state highway system and its supporting assets. Since 2019, CDOT has moved its project delivery onto PMWEB, and today PMWEB is live in every CDOT region, carrying preconstruction and construction work in one statewide system.

About the Colorado Department of Transportation

CDOT's history goes back more than a century, to the state's first highway bill in 1910 and the three-member Highway Commission it created. Today the department is responsible for a state highway system of more than 9,000 centerline miles and about 23,000 lane miles, with more than 3,400 bridges and over 28 billion vehicle miles of travel each year.

The department is headquartered in Denver and works through five transportation regions. The regions design highway projects, award construction contracts, and maintain the highway system, from paving and guardrail repair to keeping more than 35 mountain passes open year-round.

Every year that work adds up to a large, statewide construction program, with dozens of projects completed and awarded across rural and urban Colorado. Each project moves through environmental clearance, right of way, utilities, design, procurement, and construction before it closes out, generating the funding records, forecasts, contracts, pay estimates, and approvals that have to be tracked consistently in every region.

The Challenge

Before PMWEB, CDOT's project information was spread across SAP, the SiteManager construction management system, PDF forms, and one-off spreadsheets and documents. Milestones lived in SAP, forecasts were calculated as SAP drawdowns, and key records such as the environmental NEPA determination and project certification (form 128) were PDF forms with only some data captured in SAP.

For a department delivering projects in five regions, that meant teams collaborating through long email threads and extra meetings, and reports built from disjointed spreadsheets and outdated source data. CDOT needed one consistent place for project data, from preconstruction through construction, that staff across the state could adopt without extensive training.

The Solution

Following a rigorous software assessment, a statewide, cross-functional team selected PMWEB in 2019 as the best project management platform for CDOT, and then brought on HKA as its implementation partner. The team chose PMWEB for its ease of use as a collaboration platform, its visual workflow and staff task management that can be applied to any activity in the program and project lifecycle, interactive reports with region and portfolio analysis and click-through to records, significant out-of-the-box functionality that shortened implementation, and a modular design that let CDOT start with specific functionality and add more as needed.

CDOT used that modular approach to phase the rollout. Region 4 piloted the first preconstruction records in 2020, and in 2021 the department moved statewide to those initial preconstruction records. Forecast and Environmental records followed in 2022, then Contract Management and Right of Way and Survey in 2023. In 2024, Operations Evaluation and the OnBase integration went live, and in 2025 Utilities, Railroad, and ITS SEA records went live as all contract management moved into PMWEB.

Today, preconstruction in PMWEB covers Environmental, Right of Way, System Engineering Analysis, and Utilities records, including the NEPA determination and form 128, permits, ROW tracking, survey and scope, and ITS design. In construction, PMWEB replaced SiteManager: construction contracts integrate with financials as a single source of truth, tied to change orders, pay estimates, daily diaries, quantities, and finals findings. Program management covers funding records and allocations, forecasts, project delivery plans, stage gates and deliverables, operations evaluation, and a reportable record of project actions and decisions.

BI and Power BI reporting run on DataMart views, and integrations connect PMWEB to SAP, OnBase, ATSER, and Mulesoft.

The Results

CDOT now runs preconstruction and construction in one statewide platform, with PMWEB becoming the source of truth for records that used to sit in SAP and other systems.

  • 2,250 project records created to date.
  • 1,550 users registered in production.
  • Every CDOT region live on PMWEB for project delivery.
  • SiteManager replaced, with all contract management in PMWEB as of 2025.
  • Milestones now managed within project schedules in PMWEB instead of SAP.
  • Forecasts generated within PMWEB Forecast records, combining construction contract values, expenditures, and schedule begin and end dates.
  • NEPA determination and form 128 now records in PMWEB rather than PDF forms.
  • Primary project records moving to PMWEB as the source of truth as SAP changes get underway.

Teams work in a consistent project location where all project data is available at once, collaborate on assignments instead of in long email threads, and access real-time reports and dashboards built on current information.

The program keeps growing. Planned next steps include a 10 Year Plan record, Adaptive Forms, the SIMSA integration, and an upgrade to PMWEB 2025.2. By bringing preconstruction, construction, and program management onto PMWEB, CDOT has given every region the same platform and the same data to deliver Colorado's transportation projects.