Dubai Parks and Resorts is the integrated theme park destination at Jebel Ali, on the road between Dubai and Abu Dhabi, built to serve the regions within a four-hour flight of the city. When it opened in 2016 it became the largest theme park destination in the Middle East, and its first phase, three theme parks plus a retail plaza and a family hotel, was planned, procured, and delivered on PMWEB.
Dubai Parks and Resorts LLC is a subsidiary of Meraas, a Dubai holding company with landmark projects across the emirate. The destination was conceived as a mega leisure and entertainment hub, and in 2021 Meraas took full ownership of DXB Entertainments, the company that owns it.
Phase one opened in stages over the final months of 2016. LEGOLAND Dubai, the first LEGOLAND park in the Middle East, opened on 31 October together with Riverland Dubai, the themed retail and dining plaza that links the parks. Bollywood Parks Dubai, the world's first Bollywood theme park, followed on 17 November, and Motiongate Dubai, a Hollywood-inspired park with attractions from DreamWorks Animation, Columbia Pictures, and Lionsgate, opened in mid December, ahead of the official inauguration on 18 December 2016. LEGOLAND Water Park and the Polynesian-themed Lapita Hotel welcomed their first guests in January 2017.
The destination has kept evolving since, with Real Madrid World opening in 2024 on the former Bollywood Parks site. Building a multi-park resort on this scale means architects, theme park designers, contractors, program managers, and cost consultants all producing submittals, RFIs, shop drawings, meeting minutes, daily reports, and approvals at the same time, and every one of those records has to be tracked, controlled, and kept on file.
Delivering Dubai Parks and Resorts drew on construction professionals from seven different firms: Gensler, Forrec, Laing O'Rourke, ARCO General Contracting, Hill International, Samsung C&T, and Cumming. Each brought its own teams, processes, and reporting, and all of them had to work to the same program.
Tracking, controlling, and communicating project information across seven organizations with manual systems was a daunting task. Finding a document, confirming who had approved it, or seeing where procurement had stalled was arduous and time consuming at best, and in some cases fruitless. For a destination with three parks opening within weeks of each other, that lack of a single source of truth put schedule, cost, and accountability at risk. The program needed one localized, all-in-one system to track, collaborate, and control the work.
Meraas selected PMWEB as the web-based project control system for Dubai Parks and Resorts. PMWEB gave every firm on the program a single point of reference to track procurement activities, identify roadblocks early, evidence that each approval was properly authorized, and hold an authoritative record of approved project documentation.
The team used PMWEB across planning, cost management, and procurement, with engineering forms built in the Custom Form Builder for submittals, RFIs, meeting minutes, daily reports, and shop drawings. Drawing sets, correspondence, and document management kept every file attached to the record it belonged to, behind customizable security controls, while Visual Workflow and automatic notifications moved approvals online. The result was the transparency and accountability a program of this scale demands.
PMWEB became the system of record for planning, day-to-day construction management, and procurement across phase one.
With planning, procurement, documents, and approvals in one platform, Dubai Parks and Resorts gave seven firms a single, accountable way of working and opened the region's largest theme park destination on PMWEB.