Setting the Project Control System (PCS) Schedule and Resource Management Module: Schedule Performance Reporting

Function 5: Schedule Performance Reporting In addition to the wide variety of the schedule performance reports that could be either directly generated from the planning and scheduling or by interactive dashboard reporting tools like MS Power BI, there is still a requirement to generate schedule performance reports that combine the Read more…

Setting the Project Control System (PCS) Schedule and Resource Management Module: Schedule Delays

Function 4: Schedule Delays  On construction projects, schedule delay claims that affect the project completion date are becoming a common event. Those are the delays that are beyond the contractor’s control and the events that entitle the contractor to delay claims are normally specified in a contract provision. For example, Read more…

Project Control System (PCS) on Building Information Modeling (BIM) Enabled Projects

For projects where Building Information Modeling (BIM) is used by the contractor for developing the shop drawings (LOD 400) based on the issued for construction (IFC) documents (LOD 350) and later the as-built documents (LOD 500), associating the BIM model objects with the project WBS levels and activities will be Read more…