Monitoring, Evaluating, and Reporting Planned and Actual Resources Usage and Performance Efficiency During the Capital Project Engineering Phase

For Engineering Consultants, EPC Contractors, Design-Build Contractors, and other entities whose work scope includes creating engineering deliverables such as drawings and specifications. They always need to plan the resources required to make those deliverables capture the actual resource hours spent in creating them. They need this information to enable them Read more…

Objective Evaluation and Appraisal of Engineering Consultants Performance on Capital Projects

Project Owners need to monitor their engineering consultant’s performance throughout a contract stages of design and construction supervision. In addition, they need to conduct formal performance evaluations at specific points in the contract’s life cycle. These formal evaluations are done at the completion of design and at closeout of construction. Read more…