Quality Management

Inspection Checklists for Static and Rotating Equipment on Construction Sites

Inspection Checklists for Static and Rotating Equipment on Construction Sites

Written by Bassam Samman, PMP, PSP, EVP, GPM It is common for construction projects that the contractor’s scope of work...
Read More
Managing, Monitoring and Evaluating Request for Site Inspections for Construction Works

Managing, Monitoring and Evaluating Request for Site Inspections for Construction Works

Written by Bassam Samman, PMP, PSP, EVP, GPM One of the reasons for change orders that are attributed to the...
Read More
Monitoring, Evaluating and Reporting on Concrete Pour in Construction Projects Using Checklists

Monitoring, Evaluating and Reporting on Concrete Pour in Construction Projects Using Checklists

Written by Bassam Samman, PMP, PSP, EVP, GPM No one can deny the high cost, delays and wasted effort of...
Read More
Optimizing capital project testing and commissioning

Optimizing capital project testing and commissioning

Written by Bassam Samman, PMP, PSP, EVP, GPM Capital project testing and commissioning is the phase of assuring that all...
Read More
Using BIM Model to Visualize Inspection Checklists for Static and Rotating Equipment on Construction Sites

Using BIM Model to Visualize Inspection Checklists for Static and Rotating Equipment on Construction Sites

Written by Bassam Samman, PMP, PSP, EVP, GPM It is common on construction projects for the contractor’s scope of work...
Read More
Using BIM Models to Provide Visibility of Equipment and Material that Needs to be Submitted and Procured on Construction Projects

Using BIM Models to Provide Visibility of Equipment and Material that Needs to be Submitted and Procured on Construction Projects

Written by Bassam Samman, PMP, PSP, EVP, GPM One of the critical requirements on any construction project is to have...
Read More
Integrating Scope, Quality, Schedule and Cost on Construction Projects

Integrating Scope, Quality, Schedule and Cost on Construction Projects

Written by Bassam Samman, PMP, PSP, EVP, GPM One of the key challenges that project owners encounter is ensuring that...
Read More
Creating a What You See is What You Get (WYSIWYG) Work Inspection Request (WIR) Forms for Construction Projects

Creating a What You See is What You Get (WYSIWYG) Work Inspection Request (WIR) Forms for Construction Projects

Written by Bassam Samman, PMP, PSP, EVP, GPM One of the key requirements on construction projects is to have inspection...
Read More
Managing, Monitoring, Evaluating and Reporting Non-Conformance Report (NCR) on Construction Projects

Managing, Monitoring, Evaluating and Reporting Non-Conformance Report (NCR) on Construction Projects

Written by Bassam Samman, PMP, PSP, EVP, GPM A non-conformance report, or non-conformity report or NCR, is a construction-related document...
Read More
How to Implement Proactive Snagging Approach When It Comes to Inspecting Real Estate and other Capital Properties?

How to Implement Proactive Snagging Approach When It Comes to Inspecting Real Estate and other Capital Properties?

Written by Bassam Samman, PMP, PSP, EVP, GPM Real estate properties and other types of capital assets owners have the...
Read More
How Technology Helps Identify Which Submittals to Include in the Submittal Log for Construction Projects

How Technology Helps Identify Which Submittals to Include in the Submittal Log for Construction Projects

Written by Bassam Samman, PMP, PSP, EVP, GPM One of the must requirements on construction projects is that a contractor...
Read More
How to Have Complete and Comprehensive Shop Drawings, As Built Drawings, Method Statement, Material Sample and other Submittal Logs for Construction Projects?

How to Have Complete and Comprehensive Shop Drawings, As Built Drawings, Method Statement, Material Sample and other Submittal Logs for Construction Projects?

Written by Bassam Samman, PMP, PSP, EVP, GPM One of the critical requirements on any construction project is to have...
Read More
How to Implement the Proactive Snagging Approach to Identify Defects and Omissions on Construction Projects?

How to Implement the Proactive Snagging Approach to Identify Defects and Omissions on Construction Projects?

Written by Bassam Samman, PMP, PSP, EVP, GPM In construction projects, snag lists (occasionally referred to as a punch list) define...
Read More
Monitoring and Tracking Contractor’s Thirty (30) Days Submittal Requirements

Monitoring and Tracking Contractor’s Thirty (30) Days Submittal Requirements

Written by Bassam Samman, PMP, PSP, EVP, GPM Almost every construction project has immediate submittal requirements that the Contractor needs...
Read More
Tracking and Monitoring Spare Parts Usage During the Capital Project Standard and Extended Warranty Periods

Tracking and Monitoring Spare Parts Usage During the Capital Project Standard and Extended Warranty Periods

Written by Bassam Samman, PMP, PSP, EVP, GPM Once the project reaches the handover stage, the contractor needs to turn...
Read More

View Articles by Category

All Posts   |   Advanced Work Packaging (AWP) Best Practice   |   Building Information Models (BIM)   |   Construction Claims   |   Communication Management   |   Contract Management   |   Corona Virus (COVID-19) Pandemic   |   Cost Management   |   Design Management   |   Health, Safety and Environment (HSE) Management   |   Lean Construction Management Best Practice   |   Performance Reporting   |   Project Management Body of Knowledge (PMBOK)   |   Project Management Office (PMO)   |   Property Developers   |   Public Private Partnership (PPP)   |   Quality Management   |   Resource Management   |   Risk and Issue Management   |   Sustainable Project Delivery