Visual Workflow

All the Business Process You Need

The advanced tools of the Visual Workflow Platform lie at the heart of PMWeb. Because it was built from the ground up to work directly within each PMWeb record type – including Custom Forms – Visual Workflow gives you the advanced tools you need to design, monitor, and manage your collaboration and approval processes, all from a single sign in.

Using PMWeb Visual Workflow you can electronically route and track virtually every project and asset-related document. Workflow allows for both collaboration and formal approval and can be turned on or off for individual programs, projects, locations, and record types.

Workflow Animation

Why PMWeb Visual Workflow?

A number of features make PMWeb Visual Workflow the best choice:

  • Optional DocuSign integration for secure, digital signatures
  • Parallel or serial workflow
  • Custom Form Builder
  • Conditional workflow based on document content
  • Drag and drop interface
  • Unlimited workflow templates
  • Single sign in for users creating and collaborating on records
  • Review-only steps
  • Automated Process Management Rules (such as limits of authority)
  • Route digital files using Workflow
PMWeb Workflow

Each participant in a workflow fills a role. Visual Workflows can be built by linking a series of roles. One user may occupy the same role across the portfolio or the user in a role can vary for each program and project or location. After that, create workflows by defining a business process – a series of steps that a record follows. A PMWeb business process can contain two kinds of steps:

Roles

Branch Rules

A single business process can contain only role steps, only branch rule steps, or a combination of the two. Event Types determine how approvers and CCs are notified. Generate Records setting allows setting up an automatic generation of one or more related records for each action taken for a step.


Related Articles

What Progress Information is Critical to Report on During the Design Phase?

What Progress Information is Critical to Report on During the Design Phase?

Like the construction phase, project owners of capital construction projects need to be aware of how their projects are performing…
Read More
Why a Contractor Must Submit a Narrative Schedule Report With the Integrated Project Schedule

Why a Contractor Must Submit a Narrative Schedule Report With the Integrated Project Schedule

Unlike other projects, the integrated baseline schedule for capital construction projects could include thousands of activities to detail the contractor’s…
Read More
Manage Indirect Costs Using the Earned Value Management Method

Manage Indirect Costs Using the Earned Value Management Method

Each capital construction project consists of direct and indirect costs. Direct Costs are the costs that are proportional to the…
Read More
1 59 60 61 62 63 91