Digitizing the Condition Assessment Process to Improve the Buildings and Outlets Maintenance Management
Public and private sector capital assets project owners usually have a policy for managing building maintenance to ensure that nothing...
Read More
Identifying and Recording the Details of All Major Maintenance and Recapitalization Projects Needed for the Successful Operation of Linear Capital Assets
Project owners who have linear capital assets such as railways, metros, trams, highways, roads, gas and oil pipelines, sewage tunnel...
Read More
How Contractors and Subcontractors Track the Movement of All Assets Between Different Locations
Every construction contractor and subcontractor has an extensive number of plants, equipment, tools, and other assets that are deployed at...
Read More
Capturing, Documenting, Monitoring, and Evaluating Beirut Explosion Buildings Damage Assessment
The horrible Beirut Port explosion, in addition to causing the catastrophic death of almost 200 innocent people as well as...
Read More
Using Project Management Information Systems to Improve the Management of Capital Projects Adopting Offsite Manufacturing
The COVID-19 pandemic has increased the interest in adopting offsite manufacturing on capital projects, sometimes called Design for Manufacture and...
Read More
Ensuring GDPR Compliance for the Project Management Information System Selected to Manage Your Construction Project Delivery
The GDPR (General Data Protection Regulation) as well as other similar regulations which came into force both in European Union,...
Read More
How Can Technology Improve the Monitoring and Reporting of the Delivery, Storage, and Release of Equipment and Materials to Construction Sites?
One of the key requirements that need to be managed, monitored, and reported on construction projects is the delivery, storage,...
Read More
Formalizing Comprehensive, Transparent, and Unbiased Interview Questions for Approving Project Team Members to be Deployed on Construction Sites
One of the common practices in construction projects is the requirement to interview the project team members proposed by the...
Read More
The Great Value of Capturing Project Team Members’ Feedback on Projects’ Performance
Project Management Information System (PMIS) like PMWeb are the solutions that are best suited to capture the details of the...
Read More
Setting the Project Control System (PCS) Quality Management Module: Static and Rotating Equipment Inspection Checklists
Another quality control process that needs to be monitored, evaluated, and reported in the project control system (PCS) is the Static and RotatingEquipment Inspection Checklists. For oil and gas projects, static equipment comprises valves, boilers, furnaces, and...
Read More
Setting the Project Control System (PCS) Cost Management Module: Forecast Management
Regardless of whose perspective the project control system is managed, both the project owner and his team as well as...
Read More
Setting the Project Control System (PCS) Cost Management Module: Change Management
There is a very slim chance that a construction project is completed without encountering changes. There are many events that...
Read More
Setting the Project Control System (PCS) Cost Management Module: Managing the Project Commitments
Commitments are the contract agreements for which the actual cost for delivering the project’s scope of work is per the...
Read More
Setting the Project Control System (PCS) Cost Management Module: Managing the Project Budget
By definition, a project budget is the total estimated cost of completing each project activity over each phase of a...
Read More
Setting the Project Control System (PCS) Cost Management Module: Definite Cost Estimate
The third Project Control System (PCS) module needed for construction projects is the cost management module. In doing so, it...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Schedule Performance Reporting
Function 5: Schedule Performance Reporting In addition to the wide variety of the schedule performance reports that could be either...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Schedule Delays
Function 4: Schedule Delays On construction projects, schedule delay claims that affect the project completion date are becoming a common...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Updated Schedules
Function 2: Schedule Update Although the Activity Boards has the details of the actual progress achieved on the project, nevertheless...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Two-Week Look Ahead Planning
The approved baseline schedule becomes the basis for the short-term planning that is used to execute the project. On a...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Baseline Schedule
Function 1: Baseline Schedule The project’s baseline resource-loaded schedule created by the planning and scheduling team needs to be formally...
Read More