Setting the Project Control System Communication Management Module

Communication management is an integral component of any project control system (PCS) regardless of the construction project type or size as well as regardless of whether the project control system was managed by the project owner or contractor. Through the communication management module, the project control team captures all project Read more…

Setting the Project Control System (PCS) Quality Management Module: Punch List

One of the quality controls processes that exists on any construction project for which a project control system (PCS) reports is the Punch List or Snag List. The traditional approach to using this quality control process is to use it when the project reaches the stage that is considered to besubstantially completed and for the project owner instructs the engineer to do the final inspection of the completed works to determine work itemsthat need to be rectified by the contractor before it can be accepted to be turned over to the project owner. The contractor is given a specified period to do those rectifications otherwise the project owner can deduct monies from the contractor’s contract Read more…

Setting the Project Control System (PCS) Quality Management Module: Quality Performance Report

Regardless of whether the project owner has decided to digitalize the different quality control processes or not, there will be always the requirement for reporting the project quality performance status. For each of these quality control processes, the contractor’s achieved performance will be assessed and scored as: ‘Action Required’ to Read more…