Setting the Project Control System (PCS) Quality Management Module: Static and Rotating Equipment Inspection Checklists

Another quality control process that needs to be monitored, evaluated, and reported in the project control system (PCS) is the Static and RotatingEquipment Inspection Checklists. For oil and gas projects, static equipment comprises valves, boilers, furnaces, and heat exchangers. Oil and gas rotating equipment comprise turbines, pumps, and compressors. On the other hand, static equipment is with no moving parts is comparatively morereliable. Similar to the other quality control processes, the difference between a project control system (PCS) that is managed by the project owner or the contractor is the ownership of the Read more…

Setting the Project Control System (PCS) Quality Management Module: Concrete Pouring Inspection Reports

Another quality control process that needs to be monitored, evaluated, and reported in the project control system (PCS) is the Concrete Pouring Inspection Reports. It is important to manage this process as the building stability and safety depend on having a building structure that was constructed as it was originally designed. Similar Read more…

Setting the Project Control System (PCS) Cost Management Module: Managing the Project Commitments

Commitments are the contract agreements for which the actual cost for delivering the project’s scope of work is per the awarded contracts for the outsourced scope of work. For a project owner, commitments are the contract agreements with consultants for design, site supervision, cost management, project management, and other types Read more…