PMWeb 7 Actual and target Productivity Rates and Lost resource Hours by Trade

Enabling Real-Time Correlation Between Daily Project Events and Actual Productivity Rates of Work Trades on Construction Projects

One of the key challenges that face entities that are involved in delivering construction projects is how to have a real-time or an almost real-time reporting of the achieved key trade productivity rates along with the different project-related events that could have impacted those rates. This real-time reporting will not Read more…

PMWeb 7 Visual Submittal Log

Using Technology to Protect Project Owners from the Consequences of the Poorly Written or Managed Construction Project Specifications

Specifications are one of the basic components that make up the contract agreement between the Project Owner and the Contractor. Specifications define the requirements for products, materials, and workmanship upon which the contract is based and the requirements for administration and performance of the project. Project specifications are a must Read more…

PMWeb 7 Outlet Mail Engineering Forms Outlet Mail Toolbox Forms Outlet Mail Workflow

Using Project Management Information Systems to Improve the Management of Capital Projects Adopting Offsite Manufacturing

The COVID-19 pandemic has increased the interest in adopting offsite manufacturing on capital projects, sometimes called Design for Manufacture and Assembly (DfMA). It is method that many organizations are adopting for smarter, quicker, and cheaper capital project delivery. Projects that have adopted offsite manufacturing are reporting considerable project duration time Read more…