Search by module
Search by category
- Advance Work Packaging (AWP) Best Practice
- Building Information Modeling (BIM)
- Communication Management
- Construction Claims
- Contract Management
- Cost Management
- COVID-19 Pandemic
- Design Management
- Digital Transformation
- Earned Value Management
- Engineering
- Health, Safety and Environment (HSE) Management
- Lean Construction Management Best Practice
- Multilingual, Multi-currency
- Performance Reporting
- Project Management Body of Knowledge (PMBOK)
- Project Management Office (PMO)
- Property Management
- Public Private Partnership
- Quality Management
- Resource Management
- Risk Issue Management
- Sustainable Project Delivery
Digitizing the Condition Assessment Process to Improve the Buildings and Outlets Maintenance Management
PMWeb
Public and private sector capital assets project owners usually have a policy for managing building maintenance to ensure that nothing...
Read More
Identifying and Recording the Details of All Major Maintenance and Recapitalization Projects Needed for the Successful Operation of Linear Capital Assets
PMWeb
Project owners who have linear capital assets such as railways, metros, trams, highways, roads, gas and oil pipelines, sewage tunnel...
Read More
How Contractors and Subcontractors Track the Movement of All Assets Between Different Locations
PMWeb
Every construction contractor and subcontractor has an extensive number of plants, equipment, tools, and other assets that are deployed at...
Read More
Capturing, Documenting, Monitoring, and Evaluating Beirut Explosion Buildings Damage Assessment
PMWeb
The horrible Beirut Port explosion, in addition to causing the catastrophic death of almost 200 innocent people as well as...
Read More
Using Project Management Information Systems to Improve the Management of Capital Projects Adopting Offsite Manufacturing
PMWeb
The COVID-19 pandemic has increased the interest in adopting offsite manufacturing on capital projects, sometimes called Design for Manufacture and...
Read More
Ensuring GDPR Compliance for the Project Management Information System Selected to Manage Your Construction Project Delivery
PMWeb
The GDPR (General Data Protection Regulation) as well as other similar regulations which came into force both in European Union,...
Read More
How Can Technology Improve the Monitoring and Reporting of the Delivery, Storage, and Release of Equipment and Materials to Construction Sites?
PMWeb
One of the key requirements that need to be managed, monitored, and reported on construction projects is the delivery, storage,...
Read More
Formalizing Comprehensive, Transparent, and Unbiased Interview Questions for Approving Project Team Members to be Deployed on Construction Sites
Tony
One of the common practices in construction projects is the requirement to interview the project team members proposed by the...
Read More
The Great Value of Capturing Project Team Members’ Feedback on Projects’ Performance
Tony
Project Management Information System (PMIS) like PMWeb are the solutions that are best suited to capture the details of the...
Read More
Setting the Project Control System (PCS) Quality Management Module: Static and Rotating Equipment Inspection Checklists
Tony
Another quality control process that needs to be monitored, evaluated, and reported in the project control system (PCS) is the Static and RotatingEquipment Inspection Checklists. For oil and gas projects, static equipment comprises valves, boilers, furnaces, and...
Read More
Setting the Project Control System (PCS) Cost Management Module: Forecast Management
Tony
Regardless of whose perspective the project control system is managed, both the project owner and his team as well as...
Read More
Setting the Project Control System (PCS) Cost Management Module: Change Management
Tony
There is a very slim chance that a construction project is completed without encountering changes. There are many events that...
Read More
Setting the Project Control System (PCS) Cost Management Module: Managing the Project Commitments
Tony
Commitments are the contract agreements for which the actual cost for delivering the project’s scope of work is per the...
Read More
Setting the Project Control System (PCS) Cost Management Module: Managing the Project Budget
Tony
By definition, a project budget is the total estimated cost of completing each project activity over each phase of a...
Read More
Blog Contract Management Cost Management Multilingual Multi-currency Plans Portfolio Resource Management Schedules
Setting the Project Control System (PCS) Cost Management Module: Definite Cost Estimate
Tony
The third Project Control System (PCS) module needed for construction projects is the cost management module. In doing so, it...
Read More
Assets Blog Building Information Models (BIM) Project Management Office (PMO) Resource Management Schedules Tools
Setting the Project Control System (PCS) Schedule and Resource Management Module: Schedule Performance Reporting
Tony
Function 5: Schedule Performance Reporting In addition to the wide variety of the schedule performance reports that could be either...
Read More
Assets Blog Building Information Models (BIM) Forms Project Management Office (PMO) Resource Management Schedules Tools
Setting the Project Control System (PCS) Schedule and Resource Management Module: Schedule Delays
Tony
Function 4: Schedule Delays On construction projects, schedule delay claims that affect the project completion date are becoming a common...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Updated Schedules
Tony
Function 2: Schedule Update Although the Activity Boards has the details of the actual progress achieved on the project, nevertheless...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Two-Week Look Ahead Planning
Tony
The approved baseline schedule becomes the basis for the short-term planning that is used to execute the project. On a...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Baseline Schedule
Tony
Function 1: Baseline Schedule The project’s baseline resource-loaded schedule created by the planning and scheduling team needs to be formally...
Read More