Search by module
Managing the Letter of Award for Design and Construction Contracts Process in Construction Projects
Blog Contract Management Forms Tools

Managing the Letter of Award for Design and Construction Contracts Process in Construction Projects

Letter of Acceptance also referred to as the “Letter of Award”, is legally considered as the Employer’s formal acceptance of...
Read More
Disseminate Your Organization’s Project Management Knowledge into Accountable Actions Using Checklists
Blog Project Management Body of Knowledge (PMBOK) Schedules Tools

Disseminate Your Organization’s Project Management Knowledge into Accountable Actions Using Checklists

A massive volume of knowledge gets wasted every day in managing projects and in particularly engineering and construction projects. Part...
Read More
Creating the Responsibility Assignment Matrix (RAM) for Capital Projects Delivery
Assets Blog Project Management Body of Knowledge (PMBOK) Tools

Creating the Responsibility Assignment Matrix (RAM) for Capital Projects Delivery

One of the must requirements when it comes to managing any project is having the Responsibility Assignment Matrix (RAM). The...
Read More
How Can Technology Bring the Much-Needed Transparency and Objectivity in Assessing Engineering Consultants and Contractors Prequalification Documents on Capital Projects?
Assets Blog Contract Management Design Management Engineering Tools

How Can Technology Bring the Much-Needed Transparency and Objectivity in Assessing Engineering Consultants and Contractors Prequalification Documents on Capital Projects?

For a capital project owner, one of the proven response strategies for reducing the project’s risk exposure is to outsource...
Read More
Managing, Monitoring, Evaluating and Reporting on Interface Agreements In Multi-Prime Contracts on Fast Track Capital Projects
Blog Communication Management Schedules Tools

Managing, Monitoring, Evaluating and Reporting on Interface Agreements In Multi-Prime Contracts on Fast Track Capital Projects

In capital projects, have multiple prime contractors or bid packages to deliver the project’s scope of work is a very...
Read More
Setting the Project Control System (PCS) HSSE Management: HSSE Inspections Checklists
Blog HSSE Management Schedules Tools

Setting the Project Control System (PCS) HSSE Management: HSSE Inspections Checklists

Another type of Health, Safety, Security, and Environment (HSSE) processes that a project control system (PCS) usually reports on the...
Read More
Setting the Project Control System (PCS) HSSE Management: HSSE Processes
Assets Blog HSSE Management Schedules Tools

Setting the Project Control System (PCS) HSSE Management: HSSE Processes

Regardless of whether the project control system (PCS) was managed by the project owner or contractor, the PCS reporting can...
Read More
Setting the Project Control System (PCS) Quality Management Module: Quality Performance Report
Blog Quality Management Tools

Setting the Project Control System (PCS) Quality Management Module: Quality Performance Report

Regardless of whether the project owner has decided to digitalize the different quality control processes or not, there will be...
Read More
Setting the Project Control System (PCS) Quality Management Module: Static and Rotating Equipment Inspection Checklists
Blog Quality Management Resource Management Tools

Setting the Project Control System (PCS) Quality Management Module: Static and Rotating Equipment Inspection Checklists

Another quality control process that needs to be monitored, evaluated, and reported in the project control system (PCS) is the Static and RotatingEquipment Inspection Checklists. For oil and gas projects, static equipment comprises valves, boilers, furnaces, and...
Read More
Setting the Project Control System (PCS) Quality Management Module: Concrete Pouring Inspection Reports
Blog Contract Management Forms Quality Management Tools

Setting the Project Control System (PCS) Quality Management Module: Concrete Pouring Inspection Reports

Another quality control process that needs to be monitored, evaluated, and reported in the project control system (PCS) is the Concrete...
Read More
Setting the Project Control System (PCS) Cost Management Module: Managing the Project Commitments
Blog Cost Management Costs Portfolio Resource Management Tools

Setting the Project Control System (PCS) Cost Management Module: Managing the Project Commitments

Commitments are the contract agreements for which the actual cost for delivering the project’s scope of work is per the...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Schedule Performance Reporting
Assets Blog Building Information Models (BIM) Project Management Office (PMO) Resource Management Schedules Tools

Setting the Project Control System (PCS) Schedule and Resource Management Module: Schedule Performance Reporting

Function 5: Schedule Performance Reporting In addition to the wide variety of the schedule performance reports that could be either...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Schedule Delays
Assets Blog Building Information Models (BIM) Forms Project Management Office (PMO) Resource Management Schedules Tools

Setting the Project Control System (PCS) Schedule and Resource Management Module: Schedule Delays

Function 4: Schedule Delays  On construction projects, schedule delay claims that affect the project completion date are becoming a common...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Resource Management
Blog Contract Management Forms Project Management Office (PMO) Schedules Tools

Setting the Project Control System (PCS) Schedule and Resource Management Module: Resource Management

Function 3: Resource Management One of the requirements of all construction projects is for contractors to load their integrated project...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Updated Schedules
Blog Forms Project Management Office (PMO) Resource Management Tools

Setting the Project Control System (PCS) Schedule and Resource Management Module: Updated Schedules

Function 2: Schedule Update Although the Activity Boards has the details of the actual progress achieved on the project, nevertheless...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Two-Week Look Ahead Planning
Blog Project Management Office (PMO) Resource Management Schedules Tools

Setting the Project Control System (PCS) Schedule and Resource Management Module: Two-Week Look Ahead Planning

The approved baseline schedule becomes the basis for the short-term planning that is used to execute the project. On a...
Read More
Digitalizing the Issued for Construction (IFC) Contract Documents as per the FIDIC Contract Agreement for Capital Construction Projects
Blog Digital Transformation Forms Tools Workflow

Digitalizing the Issued for Construction (IFC) Contract Documents as per the FIDIC Contract Agreement for Capital Construction Projects

The Issued for Construction (IFC) drawings are sets of detailed design drawings prepared by the Design Consultant and are an...
Read More
Why Have a Real-Time Cost Ledger for Capital Construction Projects
Blog Commercial Cost Management Forms Performance Reporting Tools Workflow

Why Have a Real-Time Cost Ledger for Capital Construction Projects

By definition, a cost ledger is one of the books of account in a cost system to which entries are...
Read More
How Can a Project Management Information System Support the Building of the Perfect Project Control Organization for Capital Construction Projects?
Blog Forms Performance Reporting Tools

How Can a Project Management Information System Support the Building of the Perfect Project Control Organization for Capital Construction Projects?

The paper titled “Skills and Knowledge Requirement for Project Control Professionals” by Allan Crow, Vincent Sovis and Harish Chopra provides...
Read More
Evaluating and Shortlisting Capital Investment Opportunities Using Profit Investment Ratio (PIR) and Risk Exposure Measures
Blog Forms Plans Portfolio Risk Issue Management Schedules Tools Uncategorized Workflow

Evaluating and Shortlisting Capital Investment Opportunities Using Profit Investment Ratio (PIR) and Risk Exposure Measures

When it comes to evaluating and shortlisting capital investment opportunities, an organization needs to consider selecting and investing in them...
Read More
1 2 3 14